kjetil wrote:ok i have taken a photo off my setting,can someone explane to me what to change to get it so the spindle can get the set rpm before it goes to job:-).
On the right hand side:
'M3/M4 delay after on'... this means the time the machine waits for the spindle to spin up after its turned on the relay, but before it starts the cutting.
'M3/M4 delay after off'... This means the time the machine waits for spin down after relay is off, before doing anything else.
So in theory say it takes 10 secs for spindle to spin up.
You want to set 11,000 (11secs) for it to wait.
If you do a job where you run M3 and then M4 on a mill (router does only M3)... Then...
.... You would wait M3 spin up 11secs> run code> spin down 11 secs> switch to M4> wait 11 secs spin up> run code> spin down 11secs> go to end position.
Or something like that. You keep increasing delay time until you get the balance right.