I'm installing a RAPIDCHANGE ATC (www.rapidchangeatc.com) on my UCCNC controlled router. The Rapidchange control software needs an M6 before each T# command.
For example, in UCCNC if I enter T1 nothing happens. However if I enter M6 T1 I get tool #1 picked up.
So far I haven't been able to get my Enroute post processor to include an M6 before each tool change T# line in the code. So as things stand now I will have to manually edit in an M6 before each tool change once the G-code is created.
Does anyone know if there is a way to alter the way UCCNC sees a T# command so that it runs the M6 macro file first?
Thanks,
BH